Parkside Flats, Potters Bar
To remove the roof from both the South and North blocks and adding a further 6, 2 bedroom flats to the South block and a further 4, 2 bedroom flats to the North Block. Complete refurbishment works were also caried out to the entrance lobby, stairwells and lighting which also incorporated new fire alarm system for both blocks. New car parking spaces were installed, along with electric vehicle charging stations and metered units, with new landscaping, bins stores and sheds for the residents.
Added Value
Working in a live environment with all other existing flats occupied, care had to be taken when programming works to ensure minimal disruption. Detailed programmes were produced working alongside the management team of Parkside Management. A successful project that was completed on time, under budget and the final result looks fantastic.
- Client
- Parkside Management
- Contract Administrator
- Southgate Assoc
- Contract Duration
- 52 weeks
- Contract Value
- £1.5 million
- KPI Score
- 58/60